BG | EN

How European funding sank in Simeonovgrad: Streets without sewage, but with fake manholes

Photo: Ivan Atanasov

Under a project worth over 1.2 million leva, financed with European funds, streets in Simeonovgrad that had a sewage and water supply network were to be rehabilitated. However, an inspection showed that some of them had fake covers placed on them, imitating manholes, while rainwater flowed freely, and household waste was collected in yards and septic tanks.

The project, entitled “Rehabilitation of streets with a sewage and water supply network in Simeonovgrad”, covers the streets “Panayot Hitov”, “Oborishte”, “Lyuben Karavelov”, “Tsar Osvoboditel” (part of it), “Kapitan Petko Voivoda”, “Drava” and “Hadzhi Dimitar”. The estimated value of the public procurement is 1,240,434 leva, with the money provided by the European Union, and the payment and control are carried out by the State Fund “Agriculture”.

After the renovation, which was completed nearly 10 years ago, the condition of these streets is far from the goals of the project under which they were rehabilitated.

The sidewalks are broken and overgrown with vegetation, and the lack of sewage leads to a constant problem with drainage.

The situation is especially disturbing, given the fact that on one of the streets – “Oborishte”, is located the home of the mayor of the city – Milena Rangelova.

A mystery that the prosecutor’s office must unravel

The question arises whether an inspection was carried out to verify that the key condition for financing – the presence of a built sewage network – was met. At the moment, there is no clear answer to this question, as well as whether such a discrepancy between the project documentation and reality does not contradict the legislation.

The case was raised with the prosecutor’s office years ago. After Boyko Rashkov left his post at the Ministry of Internal Affairs, the topic seems to have been forgotten and public discussion about it has stopped.

In 2015, during the election campaign, Milena Rangelova promised the residents of these streets, mostly of Roma origin, that she would asphalt their roads. She kept her promise, but in order to receive funding, she included a Declaration under Article 313 of the Criminal Code in the set of documents. After signing it, criminal liability is incurred for submitting false data.

In this case, there is a serious discrepancy between what was declared – that the streets have sewage systems, and the real situation on the ground.

This type of case, related to the misuse of European funds, falls within the scope of the European Public Prosecutor’s Office, headed by Laura Kövesi, especially when national institutions do not show interest.

Истината струва скъпо. Ако сте я открили тук – подкрепете ни!

Най-четени: Още за новините

Още от автора

How to drain your budget with empty baby cribs

Tens of thousands of leva from the state budget were allegedly siphoned off for years through the fictitious enrolment of non-existent children at Zornitsa Kindergarten in Simeonovgrad. The...

Municipal civil servants in Simeonovgrad also receive salaries under civil contracts

Simeonovgrad Municipality paid nearly BGN 833,000 under civil contracts over the past four years. Most of the money went to employees who already had employment contracts with the...

Ivaylovgrad residents divided over the mine in Rozino

Heated debate over Rozino gold mine pits economic hopes against environmental concerns A heated public debate, marked by clashes of arguments and strong emotions, took place over the environmental...

Още за новините

There is no money for repairs, but Dryanovo is looking for a contractor to restore the Kolyu Ficheto bridge

Dryanovo Municipality has launched a procedure to select a contractor to carry out repairs and conservation-restoration works on Kolyu Ficheto’s bridge over the Dryanovska River. The estimated value...

Almost every second contract of the Municipality of Nedelino is concluded with a single offer

With only one bid submitted, 66 out of a total of 147 public procurement contracts awarded by Nedelino Municipality between October 2020 and July 2026 were signed. Their...

Medical supervision found no violations in Silistra cardiology, but does not want private partners

Medical services in invasive cardiology worth just over €1 million in 2025 and €522,000 in the first half of 2026 were carried out under a joint activity agreement...